
For the drawings everyone builds from.
Professional liability for architects, civil, structural, MEP and geotechnical engineers, surveyors, landscape architects and design-build firms.
By Sam Alishahi · CA Insurance License #4348151 · Reviewed November 2026 · How this page is researched
Design errors surface years later
A design error or omission can turn into a claim long after a project is built, which is why architects and engineers carry professional liability, usually on a claims-made basis with prior-acts coverage. Clients and public agencies often set minimum limits in their contracts.
Design-build contractors carry both a contractor's and a designer's exposure. I place A&E professional liability through a program that has specialized in design professionals for decades, alongside general liability and excess limits.
- Professional liabilityClaims from errors or omissions in your design work.
- Prior actsCoverage for past projects under claims-made policies.
- General liabilityOffice and site-visit exposures.
- Project and excess limitsHigher limits for large contracts.
What underwriters will ask
Having these ready means I can go to market on the first call. The quote form asks for the same things, and anything you don’t know yet can wait.
- Firm: disciplines, licensed professionals and years in practice.
- Revenue: annual billings by project type.
- Projects: residential share, condos and largest project.
- Contracts: use of written contracts and limitation of liability.
- Coverage now: carrier, limits and retroactive date.
- History: claims and disciplinary actions.
California's 4- and 10-year outer limits
California sets outer deadlines on defect suits against those who design, survey, plan, supervise, observe or build improvements to real property. Under Code of Civil Procedure 337.1, a suit over a patent deficiency (one apparent by reasonable inspection), including property damage, personal injury or wrongful death arising from it, generally cannot be brought more than four years after substantial completion. If the injury happens in the fourth year, a tort suit may follow within one year of the injury, but never more than five years after substantial completion. Those limits do not apply to an owner-occupied single-unit residence.
For a latent deficiency, one not apparent by reasonable inspection, Code of Civil Procedure 337.15 sets the limit at ten years after substantial completion for the deficiency itself and for property damage arising from it. It counts indemnity claims as actions, though a cross-complaint for indemnity may still be filed in a suit brought within the ten years. The ten years start no later than the earliest of final inspection by the public agency, recording of a valid notice of completion, use or occupation of the improvement, or one year after the work ends. Section 337.15 does not apply to actions based on willful misconduct or fraudulent concealment.
What I do with this on a claims-made policy:
- Ask to keep the original retroactive date when changing carriers; a later retroactive date can leave earlier projects outside a claims-made policy.
- Before retiring, selling or closing a firm, count forward from the substantial completion of the last projects and decide how long an extended reporting period should run.
- Record substantial completion, notice of completion and final inspection dates in each project file. Those dates start the clock.
Repose periods vary by state. Texas, for example, gives 10 years after substantial completion for suits against architects, engineers, interior designers and landscape architects, and eight years for most suits by a governmental entity.
The written contract the law requires
California law requires architects and engineers to use a written contract signed by the design professional and the client before work starts, unless the client states in writing that work may begin first. For architects, Business and Professions Code 5536.22 requires:
- A description of the project and of the architect's services
- The basis of compensation and the method of payment
- The architect's name, address and license number, the client's name and address, and the project address
- Procedures for additional services and contract changes, and for termination by either party
- A statement of who owns and may use the instruments of service
- A statement, in at least 12-point type, that architects are licensed and regulated by the California Architects Board, with the board's address
For engineers, Business and Professions Code 6749 requires a description of services, compensation and payment method, the engineer's name, address and license or certificate number and the client's name and address, procedures for additional services and termination, and disclosure of any current professional liability insurance policy covering the engineer in responsible charge. Under 6749, an electronic contract counts as written.
Both sections list exceptions, such as unpaid work, certain repeat clients, a client's written waiver after full disclosure, and work for public agencies (for architects, when the agency's own written contract is used). Architectural work for engineers or land surveyors is exempt, as is engineering work for other engineers, land surveyors, architects, contractors, geologists and geophysicists.
Underwriters ask whether a firm uses written contracts on every job. For engineers, the insurance disclosure in the contract should match the policy actually in force.
Architects & engineers insurance, answered
Why is A&E coverage claims-made?
Design claims often appear years after the work, so coverage responds to claims made while the policy is active, with a retroactive date covering prior work.
Do condo and residential projects cost more?
Usually. Residential and condo work carries more construction defect exposure, and carriers price it accordingly.
What happens if I retire or close the firm?
An extended reporting (tail) endorsement keeps coverage for claims made after the policy ends.
What do underwriters rate on?
Disciplines, billings, project types, contract practices, limits and claims history.
Do you need an expert to sue an architect or engineer in California?
In a professional negligence action against an architect, professional engineer or land surveyor, including a cross-complaint for damages or indemnity, Code of Civil Procedure 411.35 requires the plaintiff's or cross-complainant's attorney to file and serve a certificate. Usually it states the attorney consulted at least one licensed professional in the same discipline and concluded there is reasonable and meritorious cause; the statute also allows certificates for a looming limitations deadline or three refused consultations. Failing to file one is grounds for a demurrer or motion to strike.
Do you offer architects and engineers professional liability outside California?
Yes. Clients across the country send the same quote form. Sam Alishahi is licensed in all 50 states and Washington, DC and places policies there directly. The shopping across carriers works the same way. Rules, minimums and markets differ by state — see insurance requirements by state.
Official sources
- Cal. Code of Civil Procedure 337.1 (patent deficiencies, 4 years)
- Cal. Code of Civil Procedure 337.15 (latent deficiencies, 10 years)
- Cal. Civil Code 2782.8 (design professional indemnity limits)
- Cal. Business and Professions Code 5536.22 (architect written contracts)
- Cal. Business and Professions Code 6749 (engineer written contracts)
- Cal. Business and Professions Code 5588 (architect reporting)
- Cal. Business and Professions Code 5588.1 (insurer reporting, architects)
- Cal. Business and Professions Code 6770 (engineer reporting)
- Cal. Code of Civil Procedure 411.35 (certificate of merit)
- Tex. Civil Practice and Remedies Code 16.008 (architects and engineers, 10 years)
Send your current policy. I'll shop it.
Your disciplines, billings and current declarations page are enough to start.
Alishahi Insurance · Saman Alishahi, independent insurance broker, California License #4348151. General information, not a quote or a promise of coverage; coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.
Tell me how to reach you. I’ll take it from there.
Takes about 30 seconds. Your next step comes by email, and you get an update at every step until your quotes are ready.
(877) 711-4545Answered 24/7 · CA License #4348151
Get a reminder before your renewal.
Tell me when your policy renews and I’ll email you about six weeks before, when it’s worth comparing. One email, no calls.